Turning On Your System

Once you receive permission-to-operate (PTO) from your electric utility, Forme Solar will notify you that you can safely turn on your system. PTO after installation can take from one to six weeks depending on your local utility processing times. After PTO has been received, real-time monitoring will be available in your Enphase monitoring app within a day of turning on your system.

 

 


Turning Your System On-or-Off

Turning your PV System On

  1. Locate your Main Electrical Panel
  2. Open the Main Electrical Panel door and locate the breaker labelled, “Solar.”
  3. Switch the Solar breaker to the “On” position
  4. Locate the A/C Disconnect Panel 
  5. Move the A/C Disconnect lever to the upward/on position
  6. Locate the Enphase Combiner box and switch all of the breakers to the “On" position

Turning your PV System Off

  1. Perform the steps above in reverse order

Visual Inspection if Your System is On

  1. Check to See if there are 3 Green Lights
  2. Verify the AC Disconnect (gray box) should also be in the “ON” Position